A total of restored forest has increased to 1,780.80 ha from the previous year and surpassing target as planned in the Annual Work Plan (AWP) about 1,051.00 ha. The planting achievement is shown the table following:

Actual achievement of forest restoration work in 2014
No. Compt.# Area (ha) Achievement (ha) Zone Contractor Funded By
1. 103 50 242.20 Conservation Pemborong Alam Hijau Yayasan Sabah
2. 104 50 319.20 Conservation Kontraktor Malaysia Yayasan Sabah
3. 105 0 60.00 Conservation Kontraktor Malaysia Yayasan Sabah
4. 106 0 63.40 Conservation Yayasan Sabah Yayasan Sabah
5. 108 50 106.80 Conservation Yayasan Sabah Yayasan Sabah
6. 110 100 180.90 Conservation Syt Juta Jaya WWF (Malaysia)
80 0.00 Conservation Kontrator Malaysia WWF (Malaysia)
7. 111 0 108.90 Conservation Kontraktor Malaysia WWF (Malaysia)
8. 116 577 580.20 Conservation Syt Jaya Suria & Syt Segama Frontier (SD) Yayasan Sime Darby
117 144 119.30 Conservation Syt Segama Frontier (SD)
TOTAL : 1,051 1,780.80 (169%)  

The maintenance activity also has increased from the previous year to 20,758.88 ha and surpassed the AWP target by 528%. The maintenance achievement is shown in the table as follows :

Actual achievement of maintenance work in 2014
No. Location Compt. # Target Area (ha) Achievement (ha) Contractor Funded By
1. Bt Piton FR 103 0 1,108.07 Pemborong Alam Hijau Yayasan Sabah
2. Bt Piton FR 104 175 264.97 Kontraktor Malaysia Yayasan Sabah
3. Bt Piton FR 105 100 169.74 Kontraktor Malaysia Yayasan Sabah
4. Bt Piton FR 106 100 507.08 YS Yayasan Sabah
5. Bt Piton FR 107 0 124.82 Kontraktor Malaysia Yayasan Sabah
6. Bt Piton FR 109 460 994.62 Sulai-Sulaian, Kontraktor Malaysia, Juta Jaya WWF (Malaysia)
7. Bt Piton FR 110 560 2,714.38 Segama Forest Heritage, Kontraktor Malaysia, Impian Jaya, Juta Jaya WWF (Malaysia)
8. Bt Piton FR 111 350 1,815.29 Sulai-Sulaian, Juta Jaya, Segama Heritage WWF (Malaysia)
9. Bt Piton FR 112 530 2,666.70 Juta Jaya, Jaya Suria Yayasan Sime Darby
113 517 2,597.80 Juta Jaya, Segama Frontier, Sinar Wawasan
114 311 1,575.75 Segama Frontier, Sinar Wawasan
115 500 3,982.19 Segama Frontier
116 250 1,477.05 Segama Frontier, Jaya Suria
117 0 56.92 Segama Frontier
10. VJR Merisuli 121 80 278.00 Impian Jaya SFD
TOTAL : 3,933.00 20,758.88 (528%)  

 