REHABILITATION IN 2008, 2009 & 2010
2008
The proposed area to be planted in 2008 was approximately 1,211.0 ha, involving the rehabilitation area within the protection, conservation and production zones. In the aspect of implementation, it involved several funding contributors, such as Yayasan Sabah, WWF (Malaysia), Sime Darby Plantation Sdn Bhd, HSBC, United States of America Government and the LEAP Foundation. Most of these compartments are located at Northern Ulu Segama Forest Reserve and VJR Merisuli. The actual achievement for forest restoration in 2008 was 683.00 ha or 56% of the original target area (1,211.0 ha). There are several reasons why the target could not be achieved in 2008 due to lack of manpower, quality of planting, bad road network system and funding constraints.
Year | Contract | Compartment# | Target (ha)> |
2008 | 5 | 210 | 100 |
2009 | 5 | 100 | |
2010 | 6 | 207, 208, 210 | 1000 |
2011 | 6 | 1000 | |
2012 | 6 | 1000 | |
2013 | 7 | 97, 98, 203, 204 | 1000 |
2014 | 7 | 1000 | |
2015 | 7 | 1000 | |
2016 | 8 | 98, 99 | 1000 |
2017 | 8 | 1000 |
2009
In 2009, about 762 ha were successfully planted in Northern Ulu Segama and Merisuli, while 683 ha of planted mix species have undergone maintenance especially in Northern UluSegama, Merisuli and Sg Kawag. The achievement is shown in table as follows:
No. | Location | Compartment # | Area (ha) | Funded |
1. | Northern UluSegama | 107 | 450.0 | Yayasan Sabah |
2. | Merisuli | 121 | 219.0 | Arcus Foundation |
3. | Northern UluSegama | 109 | 55.0 | WWF Malaysia |
4. | Northern UluSegama | 112 | 38.0 | Sime Darby Plantation Sdn. Bhd. |
TOTAL : | 762 |
No. | Location | Compartment # | Area (ha) | Funded |
1. | Northern UluSegama | 105, 107 | 391.00 | Yayasan Sabah |
2. | Merisuli | 121 | 115.00 | Arcus Foundation |
3. | Northern UluSegama | 109 | 116.00 | WWF Malaysia |
4. | Sg. Kawag | 189 | 37.00 | United State of America Government |
5. | Sg. Kawag | 185 | 24.00 | 9th Malaysia plan allocation |
TOTAL : | 683.00 |
2010
The target area for forest restoration was about 1,430 ha. However, merely 724 ha were fully planted. Some of the impeding factors were: prolonged drought in the first quarter of 2010, shortage of planting materials and lower productivity of appointed contractors. The planting achievement is shown in table as follows:
No. | Location | Compt. # | Target Area (ha) | Achieved Area (ha) | Funded By | Contractor |
1. | Northern of UluSegama FR | 105 | 100 | 93.22 | YS | Kontraktor Malaysia |
2. | VJR Merisuli | 121 | 30 | 16.30 | ARCUS Foundation (LEAP) | Kontraktor Malaysia |
3. | Northern of UluSegama FR | 109 | 290 | 102.05 | WWF (Malaysia) | AlamBina Flora |
90 | 20.65 | WWF (Malaysia) | PertanianKondowoi Pemborong Am | |||
4. | Northern of UluSegama FR | 110 | 300 | 205.98 | WWF (Malaysia) | Kontraktor Malaysia |
5. | Northern of UluSegama FR | 111 | 100 | 109.91 | WWF (Malaysia) | PertanianKondowoi Pemborong Am |
6 | Northern of UluSegama FR | 112 | 300 | 175.87 | Sime Darby Plantation Sdn. Bhd. | SFD |
113 | 100 | Nil | ||||
114 | 120 | Nil | ||||
TOTAL : | 1,430 | 723.98 |
Map : Forest restoration program compartments in 2010